My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-09_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-02-09_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:21 PM
Creation date
2/9/2015 12:20:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
2/9/2015
Doc Name
2nd Adequacy Review & Cost Estimate
From
Blue Mountain Energy, Inc
To
DRMS
Type & Sequence
MR163
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST. SUMMARY WORK <br />Task description: Reclaim Drill Pads and Associated Roads <br />Site: Deserado Mine Permit Action: MR163 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/5/2015 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1981018 <br />Abbreviation: None <br />Filename: CO 18-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />Plug and Seal 7 Exploration Holes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />8.00 <br />$1,031.99 <br />$901.72 <br />$1,607.91 <br />$479.04 <br />$4,731.00 <br />$432.00 <br />$2,773.00 <br />$6,433.00 <br />Plug and Seal 5 Degas Boreholes <br />BOREHOLE <br />8.00 <br />8.00 <br />Plug and Seal 11 Nitrogen Injection Holes <br />BOREHOLE <br />Plug and Seal RS -12L <br />BOREHOLE <br />8.00 <br />Re grade Drill Pads and Vent Shaft Pad <br />DOZER <br />18.64 <br />Re grade and Replace Topsoil on Light Use Roads <br />GRADER <br />3.16 <br />Re lace Topsoil to Drill Pads and Vent Shaft Pad <br />DOZER <br />10.93 <br />Reseed Drill Pads, Vent Shaft and Associated <br />Roads <br />REVEGE <br />4.82 <br />SUBTOTALS: <br />69.55 <br />$18,390 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />46.08 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 0.00 <br />Engineering work and /or contract/bid preparation: 4.61% <br />Reclamation management and /or administration: 3.58% <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $7,853.59 <br />TOTAL BOND AMOUNT (direct + indirect) = $26,243.59 <br />$371.48 <br />$193.10 <br />$3,463.37 <br />$1,839.00 <br />$5,866.95 <br />$24,256.95 <br />Total = 0.00 <br />Total= $1,118.25 <br />$868.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.