Laserfiche WebLink
12. Primery future (Post - mining) land use (check one): <br />13. <br />S.J, Cropland(CR) 1_j Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />-tom Developed Water Resources(WR) <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />-4- <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Standard wheeled /tracked loader with /without dump truck <br />15. On Site Processing: —Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Standard processing using portable screens, crushers, washers, and similar plants. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: _ <br />Standard fuels and lubricants, and materials for maintaining vehicles and equipment <br />16. Descriotion of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This application is for the same site as M- 2008 -057, which was <br />approved but did not have a permit issued. There are changes to <br />take into account changes in structures and existing conditions, as well <br />as reducing the planned area to be affected. <br />