My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-04_REVISION - M1985029 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2015-02-04_REVISION - M1985029 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:59 PM
Creation date
2/9/2015 8:17:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
REVISION
Doc Date
2/4/2015
Doc Name
Request AM05
From
Greg Lewicki and Associates, PLLC
To
DRMS
Type & Sequence
AM5
Email Name
MAC
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 Gold Mine Facilities <br />The gold mine operation will consist of the following facilities: <br />Gold washing plant, a 170'x 80' metal building built on a concrete foundation <br />office /warehouse /shop of approximately 100'x 45' with partial concrete floor <br />assorted power poles delivering power to the camp area <br />2 portable trailers for employee temporary housing 1 -8' x 40', 1 -14' x 70' on metal skids <br />1 office trailer on metal skids 14' x 38' <br />2 porto - potties for employees and visiting personnel <br />equipment storage building (metal) on skids for easy removal 24'x 50' concrete block walls <br />sealed for secondary containment <br />small insulated pump house of 10' x 10' size and wood construction, located near South Platte River <br />where Access Ienters Highway 9, containing 88 hp motor to pump water from river <br />12" plastic water line delivering water from the pump house to the prep plant. <br />36" stacker conveyors removing waste material from the prep plant <br />36" portable overland conveyor bringing gold bearing gravel from the active cut to the prep plant <br />5" grizzly in pit <br />front end loaders of Cat 980 size (1 or 2) <br />haul trucks of Cat 769C size, 35 ton capacity, (2 or 3) <br />Cat D -8 size dozer (1 or 2) <br />in pit pump and 8" piping into sediment pond <br />Guard shack of wooden construction, 8'x 10' size without a concrete foundation <br />one 500 gallon double walled diesel tank outside office <br />3 - 500 gallon diesel tanks east of office in stock tank containment <br />One 10,000 Gal Diesel Tank east of Plant building in concrete block containment <br />No blasting will take place in this operation. Any spills of fuel or other hazardous material will be <br />reported to the Division as soon as they are discovered.Acreage Calculations <br />The gold placer operation will disturb a total of 84.5 acres. Of this amount, 36.5 acres were disturbed <br />pre -1977 and no topsoil was salvaged. The following table describes the disturbed acreage types for the <br />Alma Place Mine 01/15 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.