Laserfiche WebLink
Table 3 <br />Current Cost for Reclamation of Remaining Site <br />Task <br />Task Description <br />Direct Cost <br />5 <br />Excavate Topsoil and Haul to Mine* <br />29.00 <br />11 <br />Seal All Monitoring Wells <br />1,904.00 <br />13 <br />Reseed Mine Areas with Big Sagebrush Shrubland Seed Mix ** <br />2,125.00 <br />14 <br />Reseed Mine Areas with Big Sagebrush Shrubland Seed Mix ** <br />10,727.00 <br />34 <br />Replace Topsoil from Stockpile to Refuse Pile* <br />8.00 <br />36 <br />Regrade Refuse Pile Pond <br />808.00 <br />37A <br />Reseed Refuse Pile and Haul Road ** <br />6,710.00 <br />37B <br />Reseed Pond <br />528.00 <br />42 <br />Mobilize /Demobilize Equipment for Remaining Reclamation <br />5,752.00 <br />Total ($) <br />28,591.00 <br />Direct + Indirect Amount ($) <br />38,818.56 <br />* Adjusted based on exclusion area from waste pile <br />* * Adjusted failure rate of reseeding to 0% <br />Table 4 <br />Phase I <br />Task <br />Current <br />Releasable <br />Remaining <br />35 <br />1,365.88 <br />1,365.88 <br />0.00 <br />Previously Released Amount <br />($) <br />14,5860 <br />Releasable Amount ($) <br />1,365.88 <br />Total Amount ($) <br />14,7225.88 <br />Total Amount (%) <br />55.88 <br />