Laserfiche WebLink
TABLES <br />Table 1 <br />Munger Bond Release SL -2 <br />Phase 1 <br />1.3 Acres <br />Phase 11* <br />18.41 Acres <br />Phase 111 <br />2.9 Acres <br />* Adjusted based on exclusion area from waste pile <br />Total Applicable Bond ($) <br />263,445 <br />Amount Released to Date ($) <br />145,860 <br />Current Bond Held ($) <br />65,966 <br />Table 2 <br />Releasable Amount - Based on RN -6 <br />Task <br />Task Description <br />Direct Cost <br />Releasable <br />Remaining <br />2 <br />Regrade Mine Road and Bench <br />71724.53 <br />7,724.53 <br />0.00 <br />5 <br />Excavate Topsoil and Haul to Mine* <br />5,764.72 <br />5,735.90 <br />28.82 <br />11 <br />Seal All Monitoring Wells <br />1,860.04 <br />0.00 <br />1,860.04 <br />13 <br />Reseed Mine Areas with Big Sagebrush Shrubland Seed Mix ** <br />2,242.52 <br />448.50 <br />1,794.02 <br />14 <br />Reseed Mine Areas with Big Sagebrush Shrubland Seed Mix ** <br />11,320.14 <br />2,264.03 <br />9,056.11 <br />20 <br />Reseed Loma Loadout <br />3,540.39 <br />3,540.39 <br />0.00 <br />34 <br />Replace Topsoil from Stockpile to Refuse Pile* <br />1,647.89 <br />11639.65 <br />8.24 <br />35 <br />Regrade Haul Road <br />1,365.88 <br />1,365.88 <br />0.00 <br />36 <br />Regrade Refuse Pile Pond <br />772.94 <br />0.00 <br />772.94 <br />37A <br />Reseed Refuse Pile and Haul Road ** <br />7,080.84 <br />1,416.16 <br />5,664.68 <br />37B <br />Reseed Pond <br />445.44 <br />0.00 <br />445.44 <br />42 <br />Mobilize /Demobilize Equipment for Remaining Reclamation <br />5,751.80 <br />0.00 <br />5,751.80 <br />Total ($) <br />491517.13 <br />24,135.04 <br />25,382.09 <br />Direct + Indirect Amount ($) <br />65,965.26 <br />- <br />41,830.22 <br />* Adjusted based on exclusion area from waste pile <br />* * Adjusted failure rate of reseeding to 0% <br />