Laserfiche WebLink
RIDER TO MINING PERMIT <br />Permit Date: May 23, 2013 <br />Permit No: C- 1982 -056 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />64 - Twentymile Coal Company is approved to construct the Refuse Disposal Area Expansion in <br />accordance with designs approved in Technical Revision No. 67. Twentymile Coal Company has <br />requested to provide bond for the increased disturbance area in three increments. The first increment, <br />"Initial Bonded Disturbance" of 50.0 acres, is limited to construction of 30.3 acres refuse pile expansion, <br />2.4 acres haul road corridor, 5.9 acres unclassified stockpile, 3.5 acres topsoil stockpile, 0.4 acres stockpile <br />haul corridors, and 7.5 acres construction of RDA 10 and RDA 11 ditches, as shown on Map C -102 <br />(11/13/2009). Prior to disturbance of the Refuse Disposal Area expansion beyond the Initial Bonded <br />Disturbance, Twentymile Coal Company is required to submit additional bond adequate for disturbances <br />associated with bonding increments I, and II. No disturbance associated with bonding increments I and H <br />shall occur prior to submittal and Division approval of additional bond. <br />ACCEPTED AND AGREED: <br />SAFETY <br />X <br />By ;114k <br />Operator <br />cm. <br />Title <br />DIVISION OF RECLAMATION, MINING & <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />Division Director <br />