My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-05_INSPECTION - C1983059
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1983059
>
2015-02-05_INSPECTION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:15 PM
Creation date
2/5/2015 10:48:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Inspection
Doc Date
2/5/2015
Doc Name
Inspection Report
From
DRMS
To
Terror Creek , LLC
Inspection Date
1/22/2015
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 22, 2015 C- 1983 - 059 /Terror Creek Loadout JRS <br />ROADS — Rule 4.03: Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />- The haul road to the lower portion of the loadout is a paved road. It was stable at the time of the inspection. The <br />lower portion of the road is a gravel road. This portion of the road includes the scale and the truck loop. this <br />portion of the road was stable at the time of the inspection. <br />SUPPORT FACILITIES - Rule 4.04: <br />- The three "normal' coal stockpiles (lump, stoker and fines) were empty at the time of the inspection. All of the <br />current operations have been moved to the east of this area and east of the truck dump. The small crusher and <br />stockpiles basically fit within the haul road loop from the scale to the dump. <br />- There are three new stockpiles at the new crusher location. These are a stoker pile, a lump pile and a raw coal <br />pile. These piles are all much smaller than their respective piles at the old coal processing area. <br />- The fuel island area was stable at the time of the inspection. <br />- The shop /warehouse and office bench was stable at the time of the inspection. There were no problems noted in <br />this area. <br />DOCUMENTS RECEIVED: None <br />This concludes the 22 January 2015 partial inspection report for the Terror Creek Loadout. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.