My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-04_INSPECTION - M1993080
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1993080
>
2015-02-04_INSPECTION - M1993080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:14 PM
Creation date
2/5/2015 8:47:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993080
IBM Index Class Name
INSPECTION
Doc Date
2/4/2015
Doc Name
Inspection
From
DRMS
To
The Summit Pressed Brick and Tile Company
Inspection Date
2/12/2014
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 020 Page 2 of 2 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2754 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />135.47 LCY /hr <br />135.47 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.591/LCY <br />Total job time: <br />Total job cost: <br />6.64 Hours <br />$1,432 <br />
The URL can be used to link to this page
Your browser does not support the video tag.