Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 51 of 51 <br />DRILLING EQUIPMENT <br />Task description: Replace damage Corley water well #119459 <br />Site: Southfield Mine Permit Action: RN6 Permit /Job #: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 075 State: Colorado <br />Date: 8/29/2014 County: Fremont <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Make and Model: SCHRAMM T450BH <br />Attachment 1: Clear water pump station, 225 psi <br />Attachment 2: <br />Labor Unit 1: Driller - Diamond or Core Drill <br />Labor Unit 2: Laborer - Diamond or Core Dril <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: $85.01 NA <br />Operating Cost /Hour: $175.41 100 <br />Operator Cost /Hour: $61.79 NA <br />Total Unit Cost /Hour: $32222 <br />Total Fleet Cost /Hour: $322.22 <br />JOB TIME AND COST <br />Fleet size: I Equipment Set(s) <br />Unit cost: $322.22 /Hour <br />Abbreviation: None <br />Filename: C014 -075 <br />Horsepower: 485.00 <br />Shift Basis: 1 per day <br />Weight: 26.50 <br />(US Tons) <br />Total job time: 8.00 <br />Total job cost: $2,578 <br />Hours <br />CRCES Cost Estimating Software <br />