Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) <br />Return Route: <br />Page 91 of 558 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />183.98 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />2 <br />(min) <br />1 <br />750.00 <br />-5.00 <br />5.00 <br />0.00 <br />2938 <br />0.280 <br />minutes <br />minutes <br />325.03 LCY/Hour <br />152.70 LCY/Hour <br />1 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />Return Time: 0.280 <br />Total Truck Cycle Time: 3.576 <br />Loading Tool unit <br />Production <br />391.61 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />183.98 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 152.70 <br />Adjusted single truck/loader team production: 152.70 <br />Adjusted multiple truck/loader team production: 152.70 <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 228.88 <br />Unit cost: <br />$1.189 <br />/LCY Total iob cost: $41.542 <br />minutes <br />minutes <br />325.03 LCY/Hour <br />152.70 LCY/Hour <br />1 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />