My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-30_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-01-30_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:03 PM
Creation date
2/3/2015 12:58:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/30/2015
Doc Name
Reclamation Cost Estimate - MT4
From
Bowie Resources
To
DRMS
Type & Sequence
MT4
Email Name
SLB
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
561
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 69 of 558 <br />Task description: <br />Site: Bowie No. 2 Mine <br />COMPACTION WORK <br />Refuse on Gob Pile #2 <br />Permit Action: Midterm Review 4 <br />PROJECT IDENTIFICATION <br />Task #: 039 State: Colorado <br />Date: 10/2/2014 County: Delta <br />User: SLB <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -039 <br />Agency or organization name: DRMS <br />feet <br />4.00 <br />mph <br />10.00 <br />HOURLY EQUIPMENT COST <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />Basic Machine: CAT 815F <br />passes <br />Horsepower: 240 <br />Compactor Type: Soil - tamping foot <br />Site Altitude: <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$36.81 <br />NA <br />Operating Cost/Hour: <br />$82.25 <br />100 <br />Operator Cost/Hour: <br />$28.75 <br />NA <br />Total Unit Cost/flour: <br />$147.81 <br />Total Fleet Cost/flour: <br />$147.81 <br />MATERIAL OUANTITIES <br />Loose volume: 200,000 LCY Shrinkage factor: 0.900 <br />Compacted volume: 180,000 CCY <br />Source of estimated volume: Page 2.05 -45 <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.50 <br />feet <br />4.00 <br />mph <br />10.00 <br />inches <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />3 <br />passes <br />1,412.67 <br />CCY/hour <br />Site Altitude: <br />6,100 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,172.51 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,172.51 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) Total job time: 153.52 Hours <br />Unit cost: $0.126 per CCY Total job cost: $22,691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.