Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) <br />Return Route: <br />Page 60 of 558 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />Loading Tool unit <br />1 <br />47520.00 <br />0.00 <br />2.00 <br />2.00 <br />2905 <br />16383 <br />Return Time: 16.383 <br />minutes <br />Total Truck Cycle Time: 35.548 <br />minutes <br />Loading Tool unit <br />Production <br />423.28 <br />LCY/Hour Adjusted for job efficiency: <br />351.32 LCY/Hour <br />Truck Unit Production <br />19.05 <br />LCY/Hour Adjusted for job efficiency: <br />15.81 LCY/Hour <br />Optimal No. of Trucks: <br />22 <br />Truck(s) Selected Number of Trucks: <br />8 Truck(s) <br />Adjusted hourly truck team production: 126.50 <br />LCY/Hour <br />Adjusted single truck/loader team production: 126.50 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 126.50 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 26.68 <br />Hours <br />Unit cost: <br />$7.649 <br />/LCY Total job cost: $25,814 <br />