My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-30_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-01-30_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:03 PM
Creation date
2/3/2015 12:58:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/30/2015
Doc Name
Reclamation Cost Estimate - MT4
From
Bowie Resources
To
DRMS
Type & Sequence
MT4
Email Name
SLB
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
561
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) <br />Unit cost: $0.617 <br />/LCY Total job cost: $1,150 <br />BULLDOZER WORK <br />Page 41 of 558 <br />Task description: Push mat'l from Freeman Gulch Vent Shaft back to Cut Slope <br />Site: Bowie No. 2 Mine Permit Action: Midterm Review 4 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 017 State: Colorado <br />Date: 10/3/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />IPMENT COST <br />Cat D10T - IOSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C083 -017 <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1.370.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,600 <br />Swell factor: 1.165 <br />Loose volume: 1,864 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,748.7 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />7,000 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Utilization % <br />Ownership Cost/Hour: <br />$120.17 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1.370.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,600 <br />Swell factor: 1.165 <br />Loose volume: 1,864 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />2,748.7 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />0% <br />7,000 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.