Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) <br />Return Route: <br />Page 131 of 558 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />Loading Tool unit <br />1 <br />750.00 <br />-10.00 <br />3.00 <br />-7.00 <br />3512 <br />0.267 <br />Return Time: 0.267 <br />minutes <br />Total Truck Cycle Time: 6.722 <br />minutes <br />Loading Tool unit <br />Production <br />600.89 <br />LCY/Hour Adjusted for job efficiency: <br />498.74 LCY/Hour <br />Truck Unit Production <br />377.23 <br />LCY/Hour Adjusted for job efficiency: <br />313.10 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 626.20 <br />LCY/Hour <br />Adjusted single truck/loader team production: 498.74 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 498.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 141.47 <br />Hours <br />Unit cost: <br />$1.370 <br />/LCY Total job cost: $96,649 <br />