Laserfiche WebLink
- <br />• <br />BLE V -6 <br />)N AREAS <br />' 41.95 acres represents the total area for the entire life of mine. <br />2 The refuse or waste disposal area will be redaimed as it is used (see Map 76). 513 acres represents the total waste area <br />for the entire life of the mine. <br />Mid -Term Review 2002 (8/2002) V -28 <br />REVEGETATION IN ACRES <br />IMMEDIATE REVEGETATION <br />(at time of initial construction) <br />FUTURE <br />(attime of mine <br />closure) <br />LOCATION <br />STOCKPILE <br />CUT& <br />FILLS <br />PERMANENT <br />PERMANENT <br />Temporary Use and Laydown Areas <br />East of TS-1 <br />- <br />3.30 <br />3.30 <br />- <br />West of "D" Portal Access <br />- <br />0.20 <br />0.20 <br />- <br />East of "D" Portal Access <br />- <br />0.15 <br />- <br />0.55 <br />West of Slot Storage <br />- <br />3.70 <br />3.70 <br />- <br />West of Conveyor between Slot & Railroad <br />- <br />3.30 <br />3.30 <br />- <br />East of Slot Storage <br />- <br />2.50 <br />2.50 <br />- <br />"Y Portal <br />515 <br />9.35 <br />- <br />39.09 <br />Ventilation Entry & Access Road <br />- <br />1.03 <br />- <br />2.19 <br />B Seam Ventilation Shaft & Access <br />0.08 <br />0.44 <br />- <br />1.37 <br />Water Storage & Access Road <br />1.17 <br />438 <br />- <br />8.17 <br />Alluvial Wells <br />0.10 <br />1.05 <br />- <br />1.8 <br />Plant Access & Refuse Haul Road <br />3.30 <br />6.14 <br />- <br />17.64 <br />Refuse Haul Road (County Rd. to Refuse <br />Area) <br />5.46 <br />15.63 <br />- <br />41.95' <br />Waste Disposal Area <br />7.61 <br />- <br />- <br />513.002 <br />22.87 <br />51.77 <br />13.00 <br />625.76 <br />' 41.95 acres represents the total area for the entire life of mine. <br />2 The refuse or waste disposal area will be redaimed as it is used (see Map 76). 513 acres represents the total waste area <br />for the entire life of the mine. <br />Mid -Term Review 2002 (8/2002) V -28 <br />