Laserfiche WebLink
the end of this section. There is no pending litigation regarding either surface or <br />mineral ownership. Exhibit 1-6 provides the Permit Area Legal Description. <br />2.03.7 Relationship to Areas Designated Unsuitable for Mining <br />2.03.7(1) Unsuitable Designation Status. An environmental impact assessment prepared <br />by Bureau of Land Management (BLM) stated that the twenty criteria contained in <br />40CFR3460, published in the Federal Register July 19, 1979, would be addressed by <br />OSM and CMLRD (now DRMS) in the Technical Environmental Assessment. OSM or <br />CMLRD did not designate any area unsuitable for mining within the permit area. <br />2.03.7(2) Not Applicable <br />2.03.7(3) Not Applicable <br />2.03.8 Permit Term Information <br />The starting date for the construction activities to begin development of the mine <br />was July, 1981. Coal shipment began in the first quarter of 1984. As of 2014, the <br />mine has enough coal reserves to last for about 18 years at the current rate of <br />mining. More detailed information is given in Section III, Mine Description and <br />Section IV, Mine Surface Facilities Operation Plan. <br />2.03.9 Personal Injury and Property Damage Insurance Information <br />The information is included as Exhibit 1-4 <br />2.03.10 Identification of Other Licenses and Permits <br />A list of current licenses and permits by type, name and address of issuing authority, <br />identification number and approval date is given below; <br />(1) Air Emission Permit <br />No.12RB802 -1 F issued on April 15, 1998 (Emergency Stockpile) <br />No. 12RB802 -2 issued on June 25, 2009 (D -Portal Area) <br />No. 12RB803 -3F issued on December 29, 2003 (Refuse Haul Road) <br />No. 12RB802 -5 issued on December 29, 2003 (Overland Conveyor) <br />Permit Renewal #6 — RN-6 (04/2014) 1 -8 <br />