My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-30_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-01-30_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:03 PM
Creation date
2/3/2015 7:33:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/30/2015
Doc Name
Adequacy Response #5
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR91
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Susan Burgmaier -2- January 29, 2014 <br />c. BRL provided revised designs for the lower (1 %) segment of the East Clean <br />Water Diversion Ditch as requested. The previously approved design for the <br />ditch was a triangular configuration. The revised design indicates that the <br />channel will be trapezoidal, but the design for the trapezoidal channel is based on <br />a bottom width of 0.00 ft. Please revise the design information for the East <br />Clean Water Diversion on page Volume Xl, App. B -78 to either specify a <br />triangular channel, or provide a bottom width and revised design <br />information for a trapezoidal channel. <br />BRL: The design for the 1.% segment of the clean water ditch is for a Triangular <br />channel. Please see revised page Volume XI, App. B -78 <br />26. Issue resolved; BRL revised pages Exh -8 -31, Exh 8 -32, and Exh 8 -60 as <br />requested. <br />Miscellaneous Items from BRL's January 28, 2015 response: <br />a. BRL provided revised design information for ditches D -C3 and D -C4 to reflect <br />ground conditions. The Division will approve the revised design information. <br />b. BRL reported the location and current disposition (replaced by ditch D -C14) of <br />Culvert C9, at Curve #6 of the main haul road, and modified Maps 15 -2, 20, and <br />21 -2 accordingly. The Division will approve these modifications. <br />c. BRL revised Map 18 to reflect the currently approved disturbed area boundary. <br />The Division will approve this map revision. <br />d. BRL revised Map 20 to include the location of the water bar directing flow to ditch <br />D -C4. The Division will approve this map revision. <br />e. BRL provided revised designs to reflect the as -built construction of the East <br />Diversion ditch of Gob Pile #2. The Division will approve the revised designs. <br />Additional Item: <br />DRMS: Please revise Map 22C to be consistent with the design information for <br />the Ponds B and C drainage area culverts and ditches located in Exhibit 8. <br />BRL: Please see revised Maps 22B and 22C. <br />Additional Item (Adequacy #5) : <br />BRL: The disturbed area boundary on Map -18 has been revised to include the filter <br />building, and the fence that was re- established in the summer of 2014. No new on the <br />ground disturbance has been created with this revision, however the disturbed area will <br />
The URL can be used to link to this page
Your browser does not support the video tag.