o The switch gear building has the transformers and switch gear that are used to <br />supply the voltage needed for all site uses <br />• Thickener and Foundation <br />o 26' diameter x 8 ft high welded steel plate thickener to be removed in sections <br />using cutting torches <br />• Reinforced Concrete Slab Foundation (1692 sq. ft. in area) <br />• 2' thick slab at supports, l' thick elsewhere (see TH drawings in Appendix <br />17) all with reinforcing bars <br />• Steel beam supports on footers as shown on TH drawings <br />• Containment walls are 4 feet high around foundation and 6" thick <br />• Various piping and pumps to be removed. <br />• Battery Charging Building <br />• 45' wide x 120' long x 24' tall "at peak" <br />• Micropyle, Footer and Slab Foundation "dimensions TBW <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant, Forced Air and Baseboard heating <br />• Spray Foam Insulation <br />The Filter Building is the location where the tailings are dewatered prior to exiting the building for <br />permanent disposal in the tailings /waste rock piles. The water is recycled in the mill. Large filter <br />presses will be installed in this building and will be removed for reclamation. The filters and <br />associated piping will need to be removed for reclamation. This cost is included. <br />Revenue Mine December 2014 L -5 <br />