Laserfiche WebLink
04 C104 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />' 1e7e * * 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 - 3567 _r_.0 "_X �✓ <br />_�ro)j <br />File No.: M- 2012 -032 Site Name: Revenue Mine <br />County Ouray <br />TR# ORMS Use only) <br />Permittee: Fortune Revenue Silver Mines, Inc. <br />Operator (If Other than Permittee): K L— C E IE D <br />Permittee Representative: D i a n n a Stoo p n i kof JAN 2 b 2015 <br />DIVISION OF RECLAMATION <br />Please provide a brief description of the proposed revision: MINING AND SAFF.4 <br />This revision TR -05 provides details for the proposed thickener installation, as well as a <br />used on site. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre- defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tyne <br />110c, 111, 112 construction <br />materials, and 112 quarries <br />112 hard rock (not DMO) <br />110d, 112d(l, 2 or 3) <br />Required TR Fee <br />$216 <br />$175 <br />$1006 <br />Submitted (mark only one) <br />0 <br />