Laserfiche WebLink
GEI <br />January 28, 2015 <br />GEI Project No. 1405210 <br />Eric Scott <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Three Bells Mine Construction Material Reclamation Permit Decision Date <br />Extension r- L �- . <br />Dear Mr. Scott, <br />On behalf of our client, Martin Marietta Materials, Inc., I would like to request an <br />extension of 21 days to the decision date for the Construction Material <br />Regular (112) Operation Reclamation Permit for the Three Bells Mine. The Three <br />Bells Mine is currently operational under permit number M- 1979 -191. /\-fN- P <br />The previous decision date for the Three Bells permit amendment was <br />February 2, 2015. An extension of 21 days would change the decision date to <br />February 23, 2015. <br />Thank you for your consideration. Please let me know the updated status of the <br />decision date for the Three Bells Mine. I look forward to hearing from you soon. If <br />you have any questions, do not hesitate to contact me at the contact information <br />below: <br />Mr. Jeremy Deuto <br />c/o GEI Consultants, Inc. <br />2625 Redwing Rd., Suite 370 <br />Ft. Collins, CO 80526 <br />Office: (970) 224 -7343 <br />Mobile: (303) 775 -2063 <br />Sincerely, <br />'0� 10.0-1 <br />Jeremy Deuto, PG, EIT <br />www.geiconsultants.com GEI Consultants, Inc. <br />4601 DTC Boulevard, Suite 900, Denver, CO 80237 <br />303.662.0100 fax: 303.662.8757 <br />