Laserfiche WebLink
2.05.6(6) <br />Bowie No. 1 Mine Hydrologic Monitoring Summary <br />Overburden <br />No. <br />Overburden <br />Springs <br />Range <br />Ponds <br />Range <br />Total Analyzed <br />12 <br />250 ft to 1950 ft <br />28 <br />100 ft - 2200 ft <br />-Less than 800' Overburden - -- <br />---------------- - - - <br />- <br />- - 6-- <br />-250 ft to 750 ft <br />----- - - - - -- <br />6 <br />- - -- <br />100 ft - 750 ft <br />---- - - - - -- <br />Advance Only <br />----------------- - - - - -- <br />3 <br />- - - -- <br />400 ft to 700 ft <br />------ - - - - -- <br />3 <br />- - -- <br />350 ft - 700 ft <br />- --- - - - - -- <br />Secondary Mined <br />3 <br />250 ft to 750 ft <br />3 <br />100 ft - 750 ft <br />Greater than 800' Overburden <br />----------------- - - - - -- <br />6 <br />- - - -- <br />900 ft to 1950 ft- <br />------ - - - - -- <br />- - -- <br />850 ft - 2200 ft <br />---- - - - - -- <br />Advance Only <br />5 <br />1400 ft to 1950 ft <br />12 <br />900 ft-- 2200 ft <br />Secondary Mined <br />1 1 <br />900 ft <br />10 <br />850 ft -1600 ft <br />This data provides significant validity to the Operator's position that no <br />subsidence protection will be provided for springs or ponds unless they are a <br />decreed water right and only then if the spring or pond has an overburden <br />depth of less than 800 feet. <br />The Bowie No. 1 Mine also mined under the Pitkin Mesa Pipeline /Aqueduct <br />at overburden depths ranging from 300 to 675 feet with no detrimental <br />effects to the pipeline. <br />Sheep Corral spring and pond SP -34 -11 were undermined by the D -Seam <br />during October 2003. The overburden at this location is slightly over 1,000 <br />feet. There was no apparent damage to the spring and pond based on <br />monitoring results since the spring and pond were undermined. The spring <br />and pond were not mined under by the B -Seam. <br />Pond and spring 20 were undermined by the B -Seam during May 2013. The <br />overburden at this location is 1,250 feet. There was no apparent damage to <br />the spring and pond based on monitoring results since the spring and pond <br />were undermined. <br />PR -14 2.05-161- 03/14 <br />