My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-28_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-01-28_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:58 PM
Creation date
1/29/2015 8:13:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/28/2015
Doc Name
5th Adequacy Review Letter
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR91
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation,. <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />January 28, 2015 <br />William A. Bear <br />Bowie Resources, LLC <br />P.O. Box 483 <br />Paonia, CO 81428 <br />Re: Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Technical Revision No. 91 (TR- 91) <br />Drainage /Sediment Control /SAE Updates <br />Fifth Adequacy Review <br />Dear Mr. Bear: <br />The Division has reviewed the January 28, 2015 response, submitted by JE Stover and <br />Associates on behalf of Bowie Resources, LLC (BRL), to the Division's January 13, 2015 fourth <br />adequacy review letter for Technical Revision No. 91 (TR -91) for the Bowie No. 2 Mine. The <br />revision updates the drainage and sediment control information in the currently approved <br />permit application package, in response to deficiencies identified during recent inspections. <br />We have the following comments and questions regarding BRL's response and revised <br />application materials. The numbering convention follows the first four adequacy review letters; <br />items resolved prior to the fourth adequacy review response have been omitted. <br />9. BRL revised page EXH -8 -31 as requested, to include information for Culvert C -1329. Please <br />revise page EXH -8 -31 to include the minimum culvert diameter information (36 ") for <br />Culvert C -829. The flow listed on page EXH -8 -31 is inconsistent with the design information <br />on proposed page EXH -8- 32xxxii. Please revise the design information on EXH -8- 32xxxii to <br />be consistent with the table on page EXH -8 -31, which is based on the revised flow value <br />for ditch C -C11. <br />21. There were three separate issues under Item 21, previously not numbered. <br />a. Issue resolved; BRL revised Map 15 -3 as requested. <br />p co� <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us I <br />John W. Hickenlooper, Governor Mike King, Executive Director Virginia Brannon, Director * •► 1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.