My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-27_REVISION - M1979191 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2015-01-27_REVISION - M1979191 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:20 PM
Creation date
1/28/2015 11:51:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
1/27/2015
Doc Name
Three Bells Mine Adequacy Response AM01
From
GEI Consultants, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Exhibit L - Reclamation Costs <br />Attached are the estimated reclamation costs for the Three Bells Mine, developed to reclaim <br />the site to Developed Water Storage. The costs have divided by mining locations and phases <br />within the Three Bells Mine, including Veldman and Ditullio Phases/p nds 1 through 5. The <br />quantities utilized in the reclamation costs have been developed from the actual designs for <br />the slope liners and area fills currently being constructed (Veldman) for planned ( Ditullio). <br />The unit prices presented for the individual items have taken from Engineers Opinions of <br />Costs (EOC) developed for N4N4MMM for use in bidding the projects. The EOC was <br />developed based on GEI staff experience in the region on similar projects, and in <br />consultation with local earthmoving contractors. <br />The eaFthmeving poi4ion of the reclamation within the Veldman PropeAy has been bid out <br />and awarded b MMMA,ith constmetion slated to begin inApril 2014. Howe er&s a result <br />ef the high naneff en the Gaehe !a Peudre River, the pr-ejeetwas delayed until August-te�- <br />September- 2014 (based an site eenditions).The reclamation slope for the Veldman Property <br />has been completed, and the estimated costs listed in Table 5 reflect the remaining portion of <br />the reclamation plan. Earthmoving reclamation within the Ditullio portion of the site will be <br />conducted concurrently with mining. N4N4N4MM }glans to filled in Phase 5 as mining <br />commenceds within Phase 3. Phases 1, 3, and 4 will be constructed from overburden <br />material that has been stockpiled onsite or excavated during stripping operations. Phase 2 <br />will be utilized for wash fines during the Ditullio mining operations, and will be feelaimed to <br />an unlined openwatef p backfilled. <br />The vegetation acreage has been estimated based on the areas within the permit boundary <br />outside of the proposed Developed Water Storage (or unlined open water pond), as water <br />levels within these areas will fluctuate (based on storage needs) and do not require <br />vegetation. <br />The reclamation costs are summarized in Table 56 and 7: <br />GEI Consultants, Inc. 32 Jane January 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.