measurement during August of 2013 (Table 4). There are several monitoring wells that <br />were installed during the design phase of the Ditullio Property to assist in data gathering for <br />design and mine planning. However, the location of the monitoring wells will result in <br />their destruction during the construction of the Developed Water Storage Five new <br />monitoring wells were installed (Table 5) on the Ditullio Property in January 2015 and will <br />be monitored monthly for changes in groundwater levels through the first year and then <br />monitored quarterly for the remainder of permitted mining activities <br />i aUie 4: veiuman <br />opservatlon wen water level aata; <br />proviaea py Ueere and Ault <br />Monitoring <br />Well Name <br />TH -6 <br />TH -7 <br />TH -8 <br />Th -9 <br />Top of PVC <br />4810.2 <br />4803.6 <br />4815.8 <br />4812.8 <br />Casing <br />Elevation (ft) <br />Casing <br />Sticku ft <br />2 =3 <br />1_6 <br />2_9 <br />3_1 <br />Ground <br />Elevation of <br />4807.8 <br />4802.0 <br />4812.9 <br />4809.7 <br />Well Lftj <br />Bottom <br />Elevation of <br />4795.8 <br />4781.8 <br />4784.9 <br />4791.7 <br />Well ft <br />Total Well <br />Depth <br />Ground- <br />12.0 <br />20.2 <br />28.0 <br />18,0 <br />Bottom ft <br />Depth <br />Ground <br />Depth <br />Ground <br />Depth <br />Ground <br />Depth <br />Ground <br />From <br />Water <br />From <br />Water <br />From <br />Water <br />From <br />Water <br />Date <br />Top of <br />Elevation <br />Top of <br />Elevation <br />Top of <br />Elevation <br />Top of <br />Elevation <br />(ft) <br />jftJ <br />u <br />Casing <br />Casing <br />Casing <br />Casinq <br />M <br />M <br />M <br />u <br />0) <br />8/23/2013 <br />8_4 <br />4801.8 <br />20.7 <br />4782.9 <br />24.4 <br />4791.6 <br />L6.6 _ <br />1 4796.2 <br />Should MM receive notification of adverse (a deviation from historic groundwater levels <br />of +/ -2 feet) groundwater conditions or a complaint from the well owner, MM will <br />notify the DRMS and propose mitigation measures. Mitigation measures may include <br />the following and will be done in consultation with the DRMS: <br />• Investigation of the notification/complaint to establish parameters and to detennine <br />if MM mining operations are the sole cause or contributing to the adverse <br />groundwater conditions. This measure may include the installation of additional <br />monitoring wells at strategic locations to assist in data gathering. <br />• In the event of adverse Groundwater conditions MM will consult with the DRMS on <br />appropriate mitigation measures including (but not limited to) providing temporary or <br />permanent alternative water sources to impacted well owners repairing or deepening <br />affected wells, installing_ physical measures such as perimeter drains well points low <br />permeability barriers, etc. to assist in mitigation of the adverse groundwater conditions <br />GEI Consultants, Inc. 26 June - January 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />