My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-27_REVISION - M1979191 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2015-01-27_REVISION - M1979191 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:20 PM
Creation date
1/28/2015 11:51:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
1/27/2015
Doc Name
Three Bells Mine Adequacy Response AM01
From
GEI Consultants, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Exhibit G - Water Information <br />The Three Bells Mine operation is not expected to directly affect surface water-OT- <br />. The mining is relatively shallow, typically to a depth of approximately 20 feet <br />below ground surface. <br />Impact to groundwater will be minimal along the west side of the existing mine, west of the <br />Cache la Poudre River. Any depletions to the Cache la Poudre River that are associated with <br />mining are currently mitigated to prevent injury to the vested senior water rights by having <br />an approved Temporary Substitute Water Supply Plan in place. This plan will remain in <br />effect until the liners have been certified or backfilling is complete and there is no longer a <br />need for processing water. <br />No toxic or hazardous chemicals or liberating agents are used for mineral extraction. <br />Estimated water requirements for the project vary depending on several factors including <br />season and precipitation. Projected water usage estimates range from 75,000 - 900,000 <br />gallons per month. Monthly water usage and future estimates provided my MM are shown in <br />Table 43. <br />Table 3: Three Bells Makeup Water <br />Month <br />Wash Water (gallons) <br />Water for Dust Control and <br />Construction (gallons) <br />September 2013 <br />- <br />850,000 <br />October 2013 <br />- <br />600,000 <br />November 2013 <br />- <br />250,000 <br />December 2013 <br />- <br />150,000 <br />January 2014 <br />- <br />75,000 <br />February 2014 <br />- <br />75,000 <br />March 2014 <br />- <br />800,000 <br />April 2014 <br />- <br />800,000 <br />May 2014 <br />136,560 <br />800,000 <br />June 2014 <br />131,040 <br />900,000 <br />July 2014 <br />163,200 <br />900,000 <br />August 2014 <br />115,920 <br />900,000 <br />September 2014 <br />105,120 <br />850,000 <br />October 2014 <br />193,920 <br />600,000 <br />November 2014 <br />181,920 <br />250,000 <br />December 2014 <br />110,400 <br />150,000 <br />January 2015 <br />72,000 <br />75,000 <br />February 2015 <br />132,000 <br />75,000 <br />March 2015 <br />132,000 <br />800,000 <br />GEI Consultants, Inc. 23 dt+HeJanuary 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.