Laserfiche WebLink
7. Exhibit G - Water Information <br />The Three Bells Mine operation is not expected to directly affect surface water-OT- <br />. The mining is relatively shallow, typically to a depth of approximately 20 feet <br />below ground surface. <br />Impact to groundwater will be minimal along the west side of the existing mine, west of the <br />Cache la Poudre River. Any depletions to the Cache la Poudre River that are associated with <br />mining are currently mitigated to prevent injury to the vested senior water rights by having <br />an approved Temporary Substitute Water Supply Plan in place. This plan will remain in <br />effect until the liners have been certified or backfilling is complete and there is no longer a <br />need for processing water. <br />No toxic or hazardous chemicals or liberating agents are used for mineral extraction. <br />Estimated water requirements for the project vary depending on several factors including <br />season and precipitation. Projected water usage estimates range from 75,000 - 900,000 <br />gallons per month. Monthly water usage and future estimates provided my MM are shown in <br />Table 43. <br />Table 3: Three Bells Makeup Water <br />Month <br />Wash Water (gallons) <br />Water for Dust Control and <br />Construction (gallons) <br />September 2013 <br />- <br />850,000 <br />October 2013 <br />- <br />600,000 <br />November 2013 <br />- <br />250,000 <br />December 2013 <br />- <br />150,000 <br />January 2014 <br />- <br />75,000 <br />February 2014 <br />- <br />75,000 <br />March 2014 <br />- <br />800,000 <br />April 2014 <br />- <br />800,000 <br />May 2014 <br />136,560 <br />800,000 <br />June 2014 <br />131,040 <br />900,000 <br />July 2014 <br />163,200 <br />900,000 <br />August 2014 <br />115,920 <br />900,000 <br />September 2014 <br />105,120 <br />850,000 <br />October 2014 <br />193,920 <br />600,000 <br />November 2014 <br />181,920 <br />250,000 <br />December 2014 <br />110,400 <br />150,000 <br />January 2015 <br />72,000 <br />75,000 <br />February 2015 <br />132,000 <br />75,000 <br />March 2015 <br />132,000 <br />800,000 <br />GEI Consultants, Inc. 23 dt+HeJanuary 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />