Laserfiche WebLink
5.5 Reclamation Performance Standards <br />5.5.1 Establishing Post - Mining Use <br />Post - mining use of the land is anticipated to be f r housing development and below grade <br />reservoirs and graded areas revegetated and returned to property owners. <br />There will be no Substituted Land to be reclaimed, as defined in Rule 3.1.2. <br />Mining reclamation is expected to be completed as proposed in the design plan within the <br />five year timeframe required in Rule 3.1.3. The anticipated schedule indicates slope liner <br />completion and pit backfill within approximately X8-24 months. <br />5.5.2 Public Use <br />Design of the reclaimed reservoir slope liners i�has not anticipated €e - public recreational <br />use of the lined reservoirs. The crest of the slope liners is designed to slope approximately <br />2% into the reservoirs. <br />111 PRO �.72'72'111113 <br />OBM <br />5.5.3 Reclamation Measures — Material Handling <br />Approximate final site grading at the Three Bells Mine is anticipated to occur according to <br />the following: <br />3:1 (FIN) — Reclaimed, lined reservoir slopes <br />2% — Lined reservoir crest <br />0 -5% — Typical reclaimed land slope <br />All site grading will comply with CO SEO requirements for stable slope reclamation. <br />Maximum reclaimed slope will be 3:1 (FIN). Reclamation grading measures will comply <br />with all local and state erosion prevention measures. Local areas will be stabilized for erosion <br />control as needed. <br />Areas to be backfilled (parts of Phase 4, Phase 5, Ditullio Property) will be compacted to <br />adequate compaction for stability. <br />GEI Consultants, Inc. 19 June-January 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />Rate Lbs. /Acre <br />Species <br />Preferred Varieties <br />PLS Seeded /Acre <br />Planted (Drilled 1) <br />2,570,000 <br />Totals <br />14.25 <br />(59 seeds /sq.ft.) <br />5.5 Reclamation Performance Standards <br />5.5.1 Establishing Post - Mining Use <br />Post - mining use of the land is anticipated to be f r housing development and below grade <br />reservoirs and graded areas revegetated and returned to property owners. <br />There will be no Substituted Land to be reclaimed, as defined in Rule 3.1.2. <br />Mining reclamation is expected to be completed as proposed in the design plan within the <br />five year timeframe required in Rule 3.1.3. The anticipated schedule indicates slope liner <br />completion and pit backfill within approximately X8-24 months. <br />5.5.2 Public Use <br />Design of the reclaimed reservoir slope liners i�has not anticipated €e - public recreational <br />use of the lined reservoirs. The crest of the slope liners is designed to slope approximately <br />2% into the reservoirs. <br />111 PRO �.72'72'111113 <br />OBM <br />5.5.3 Reclamation Measures — Material Handling <br />Approximate final site grading at the Three Bells Mine is anticipated to occur according to <br />the following: <br />3:1 (FIN) — Reclaimed, lined reservoir slopes <br />2% — Lined reservoir crest <br />0 -5% — Typical reclaimed land slope <br />All site grading will comply with CO SEO requirements for stable slope reclamation. <br />Maximum reclaimed slope will be 3:1 (FIN). Reclamation grading measures will comply <br />with all local and state erosion prevention measures. Local areas will be stabilized for erosion <br />control as needed. <br />Areas to be backfilled (parts of Phase 4, Phase 5, Ditullio Property) will be compacted to <br />adequate compaction for stability. <br />GEI Consultants, Inc. 19 June-January 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />