My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-27_REVISION - M1979191 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2015-01-27_REVISION - M1979191 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:20 PM
Creation date
1/28/2015 11:51:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
1/27/2015
Doc Name
Three Bells Mine Adequacy Response AM01
From
GEI Consultants, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.5 Reclamation Performance Standards <br />5.5.1 Establishing Post - Mining Use <br />Post - mining use of the land is anticipated to be f r housing development and below grade <br />reservoirs and graded areas revegetated and returned to property owners. <br />There will be no Substituted Land to be reclaimed, as defined in Rule 3.1.2. <br />Mining reclamation is expected to be completed as proposed in the design plan within the <br />five year timeframe required in Rule 3.1.3. The anticipated schedule indicates slope liner <br />completion and pit backfill within approximately X8-24 months. <br />5.5.2 Public Use <br />Design of the reclaimed reservoir slope liners i�has not anticipated €e - public recreational <br />use of the lined reservoirs. The crest of the slope liners is designed to slope approximately <br />2% into the reservoirs. <br />111 PRO �.72'72'111113 <br />OBM <br />5.5.3 Reclamation Measures — Material Handling <br />Approximate final site grading at the Three Bells Mine is anticipated to occur according to <br />the following: <br />3:1 (FIN) — Reclaimed, lined reservoir slopes <br />2% — Lined reservoir crest <br />0 -5% — Typical reclaimed land slope <br />All site grading will comply with CO SEO requirements for stable slope reclamation. <br />Maximum reclaimed slope will be 3:1 (FIN). Reclamation grading measures will comply <br />with all local and state erosion prevention measures. Local areas will be stabilized for erosion <br />control as needed. <br />Areas to be backfilled (parts of Phase 4, Phase 5, Ditullio Property) will be compacted to <br />adequate compaction for stability. <br />GEI Consultants, Inc. 19 June-January 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />Rate Lbs. /Acre <br />Species <br />Preferred Varieties <br />PLS Seeded /Acre <br />Planted (Drilled 1) <br />2,570,000 <br />Totals <br />14.25 <br />(59 seeds /sq.ft.) <br />5.5 Reclamation Performance Standards <br />5.5.1 Establishing Post - Mining Use <br />Post - mining use of the land is anticipated to be f r housing development and below grade <br />reservoirs and graded areas revegetated and returned to property owners. <br />There will be no Substituted Land to be reclaimed, as defined in Rule 3.1.2. <br />Mining reclamation is expected to be completed as proposed in the design plan within the <br />five year timeframe required in Rule 3.1.3. The anticipated schedule indicates slope liner <br />completion and pit backfill within approximately X8-24 months. <br />5.5.2 Public Use <br />Design of the reclaimed reservoir slope liners i�has not anticipated €e - public recreational <br />use of the lined reservoirs. The crest of the slope liners is designed to slope approximately <br />2% into the reservoirs. <br />111 PRO �.72'72'111113 <br />OBM <br />5.5.3 Reclamation Measures — Material Handling <br />Approximate final site grading at the Three Bells Mine is anticipated to occur according to <br />the following: <br />3:1 (FIN) — Reclaimed, lined reservoir slopes <br />2% — Lined reservoir crest <br />0 -5% — Typical reclaimed land slope <br />All site grading will comply with CO SEO requirements for stable slope reclamation. <br />Maximum reclaimed slope will be 3:1 (FIN). Reclamation grading measures will comply <br />with all local and state erosion prevention measures. Local areas will be stabilized for erosion <br />control as needed. <br />Areas to be backfilled (parts of Phase 4, Phase 5, Ditullio Property) will be compacted to <br />adequate compaction for stability. <br />GEI Consultants, Inc. 19 June-January 20145 <br />Three Bells Mine Reclamation Permit Amendment <br />
The URL can be used to link to this page
Your browser does not support the video tag.