Laserfiche WebLink
(Form 2 — (Public File) <br />F. New Road(s): Length 400 (ft) Width 12 (ft) <br />Significantly Upgraded Road(s) Length N/A (ft) Width (ft) Are <br />culverts or other crossings proposed? If so, please describe: <br />Two 48" X 12' culverts will be installed at a snow melting runoff area and one 24" X 12' installed at the road <br />entrance. <br />The road will have crown to ensure water runoff. Maintaince of the access road will be performed as needed <br />basis by grading and use of water for dust abatement. <br />Access road will be used to haul to drill pad the drilling equipment on a truck/low bed trailer. Daily trips on <br />road include a water truck, security vehicle and a work pickup. <br />G. Total project area to be disturbed five (5) (acres) <br />H. Describe the equipment to be used for the prospecting operations: <br />*Road and drill pad site construction equipment list: <br />1 - D8 or D9 Dozer 10 -12 ft blade. <br />1— Excavator to install pit runs and road base. <br />1— Front End Loader model 950 <br />1 — Vibratory Compactor <br />1— 2,000 gallon Water Truck with sprayer <br />1— Motor Grader <br />2 — Heavy Trucks: dump & belly dump — to import road and pad grading material as required. <br />1 - Structures: Portable Port potty M/F used by construction workers. <br />1 - Operator pickup, security vehicle and/or tool truck. <br />Use of all listed construction equipment will be as needed basis during 3 week construction period. Parking <br />for construction equipment and vehicles not in use will be on south side of CO Hwy 82 going west 100' from <br />proposed road and hairpin curve on CO Hwy 82. Parking area dimensions are 70 yards long and 40 yards <br />wide. <br />*List of drilling operations equipment that would be included at the drill site: <br />Versa Drill KMB 1.4 footprint size: 8'x20', 6' high, powered by an electrical motor. <br />Caterpillar XQ230 Generator: Constructed of 12 - gauge steel, mounted on a 4 wheel mobile trailer, 24 volt <br />DC control, UL142 certified duel wall fuel tank with monitoring control, air to air after cooling, separate vented <br />