My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-23_PERMIT FILE - P2015002
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2015002
>
2015-01-23_PERMIT FILE - P2015002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:50 PM
Creation date
1/28/2015 11:16:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2015002
IBM Index Class Name
PERMIT FILE
Doc Date
1/23/2015
Doc Name
NOI application - Form 2
From
J & S Mining LLC
To
DRMS
Email Name
DMC
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />er is no top soil on the site from o rs ver all material will set to the side in a designated pi a <br />at a 211 slope for proper drainage and earthen stability. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />he e5asting portal is open and causes a secu nry/health threat to trespassers. we would like to put a new secure metal <br />bdft on the portal with double hooded kx*s The dour will he made out of Shc�d bars and expanded metal to pervent <br />accidertal entry into the mine. The land owner would We the the door to be left permanent for future exploration. All other <br />11. Describe how roads will be reclaimed or returned to their pre- prospecting (or better) condition: <br />
The URL can be used to link to this page
Your browser does not support the video tag.