Laserfiche WebLink
(FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />er is no top soil on the site from o rs ver all material will set to the side in a designated pi a <br />at a 211 slope for proper drainage and earthen stability. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />he e5asting portal is open and causes a secu nry/health threat to trespassers. we would like to put a new secure metal <br />bdft on the portal with double hooded kx*s The dour will he made out of Shc�d bars and expanded metal to pervent <br />accidertal entry into the mine. The land owner would We the the door to be left permanent for future exploration. All other <br />11. Describe how roads will be reclaimed or returned to their pre- prospecting (or better) condition: <br />