Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Water Storage Areas and Access Road <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: 003 <br />Total unit Cost/Hour: $271.17 <br />Total Fleet Cost/Hour: $1,084.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,750 <br />Swell factor: 1.111 <br />Loose volume: 5,277 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV <br />Operator Study <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />5,300 feet <br />2,743 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$8.91 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $271.17 <br />Total Fleet Cost/Hour: $1,084.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,750 <br />Swell factor: 1.111 <br />Loose volume: 5,277 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV <br />Operator Study <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />5,300 feet <br />2,743 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />