My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-27_INSPECTION - C1992081
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1992081
>
2015-01-27_INSPECTION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:55 PM
Creation date
1/27/2015 1:03:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Inspection
Doc Date
1/27/2015
Doc Name
Inspection Report
From
DRMS
To
Hayden Gulch Terminal, LLC
Inspection Date
1/22/2015
Email Name
JHB
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 22, 2015 C- 1992- 081/Hayden Gulch Loadout JHB <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />N -Other <br />NA - Processing Waste <br />R - Roads <br />R - Reclamation Success <br />N - Revegetation <br />NA - Subsidence <br />N - Slides and Other Damage <br />N - Support Facilities On -site <br />N -Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />R - Topsoil <br />COMMENTS <br />This was an aerial inspection consisting of collection of aerial photos by Harry Ranney of DRMS on 1/22/2015, <br />and review of the aerial photos by Janet Binns of CDRMS on 1/27/2015. The load out consists of a mostly <br />reclaimed coal loading facility, along with an unreclaimed rail loop, and an unreclaimed haul road (TAHR). <br />The weather appeared to be clear at the time of the inspection. The load out site is snow bound., though the <br />TAHR is plowed and maintained. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Two sediment ponds remain on site. The Rail loop pond was snow covered with no apparent pool. The <br />Truck loop pond was snow covered. The aerial photo was not clear enough to determine if a frozen pool of water <br />remains in the Truck Loop pond. <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The Tie - Across Haul Road connects Routt County Road No. 27 to Routt County Road No. 53 to allow <br />Seneca Coal Company access between mining operations. Although the Seneca Coal operations are inactive, SCC <br />still uses the TAHR. <br />The TAHR was plowed and appears to be in good conditions. Roadside ditches appear to be functional. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.