Laserfiche WebLink
2.04.7 Hydrology Description <br />Bedrock Groundwater <br />DRMS rules require investigation of each aquifer above, within and, if <br />potentially impacted, below the lowest coal seam to be mined. Since the <br />permit application is solely for a unit train loadout, no investigation of <br />bedrock groundwater was performed for the loadout. No mining will occur <br />so bedrock groundwater will not be impacted. <br />Permit Application 2.04 -17 04/11 <br />