Laserfiche WebLink
reclaimed area. Any settling that may take place will occur under the weight of the stockpiles <br />and is filled in by the material that is stockpiled. <br />4. Bonding of Imported Materials: The mining plan for this site is to remove enough material to <br />meet our needs for one construction season. In turn, the mined area is already open so that the <br />fill material can be dumped directly into the mined area. We do not anticipate any stockpiles of <br />non - product material at the site. Also, not all of the fill material is imported material; we have <br />several operations at this site that develop materials that are not suitable for resale. These <br />byproducts such as waste material from our soil screening and mixing operation are used as <br />backfill for the mined area. Additional bonding should not be necessary for this site. <br />Hopefully this addresses all of your concerns for the Technical Revision at this site. Please contact me if <br />you have any further questions. <br />Sincerely, <br />Tom Smith <br />General Manager <br />Rocky Mountain Materials and Asphalt, Inc. <br />719 - 473 -3100 <br />