My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-20_REVISION - M2006003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006003
>
2015-01-20_REVISION - M2006003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:25 PM
Creation date
1/26/2015 4:25:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
REVISION
Doc Date
1/20/2015
Doc Name
Request for SR01
From
Bestway Concrete & Aggregate Inc.
To
DRMS
Type & Sequence
SR1
Email Name
ECS
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />alroedooper <br />>siaecut %rector <br />Dick Wolfe, P.E. <br />December 16, 2011 Director /State Engineer <br />David L. Nettles, P.E. <br />Division Engineer <br />DEERE & AULT CONSULTANTS, INC. <br />DEREK H. FOSTER, P.E. <br />600 S. AIRPORT ROAD, BUILDING A, SUITE 205 <br />LONGMONT, CO 80503 <br />RE: SLURRY WALL LINER APPROVAL <br />KIRBY- DERSHAM RESERVOIR, WDID 0203386 <br />PARKER- DERSHAM RESOURCE PIT, DRMS M- 2006 -003, WDID 0203026 <br />BASELINE RESOURCE PIT, DRMS M- 1997 -058, WDID 02030117 <br />E% SE' /. S36- TIN -R67W, WATER DIVISION 1, WATER DISTRICT 2 <br />Dear Derek: <br />The purpose of this letter is to approve the fining of the Kirby- Dersham Slurry Wall. The slurry wait is <br />generally located in the E% of the SEY4 of Section 36, Township 1 North, Range 67 West, abuts the <br />adjacent Robert Walker Reservoir (WDID 0203358) and is a part of the Parker- Dersham Resource <br />and Baseline Resource Gravel Pits, The slurry wall liner test commenced May 22, 2011 and <br />concluded on September 8, 2019. A site inspection was perbrrned by our office on September 8, <br />2011 to review site conditions and the leak test plan. <br />Your report dated December 12, 2011 provides the liner summary and 90 -day leak test raesulL The <br />test data provided indicates that the oft has been lined to the design standard referenced in the <br />August 1999 State Engineer Guidelines for Lining Criteria for Gravel Pits (1999 SEO Guidelines). <br />Meeting the design standard requires that all water Inflows and outflows for ON liner perimeter <br />enclosed area must be accounted for on a monthly basis. <br />With this liner approval, the Kirby- Dersharn Reservoir may be used to stone water in accordance with <br />the 1999 SEO Guidelines. Prior to ANY use of this site, the owner or operator will need to coordinate <br />with the District 2 Water Commissioner, to review opt and accounting. <br />Please contact me at the number below if you have any questions. <br />Sincerely, <br />on NI. Hemandeir, i <br />Water Aesource Engineer <br />ec: Bill Schneider, Acting District 2 Wafer Commissioner <br />Joanna Wifiianw, Denver SEO <br />WDID File (0203017.0203426, 0203386) <br />Water Division 1 • Greeley <br />810"Street Suite 200 • Greeley, co 80631 • Phone: 970 -352 -8712 • Fax: 970 - 392 -7616 <br />www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.