Laserfiche WebLink
-4- <br />12. Primary future(Post_r_r_>nine) land use (check on <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) _ Forestry(FR) <br />Residential(RS) Recreation(RC) <br />X Developed Water Resources(WR) <br />13. Primary aresent land use (check onel: <br />Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) ForestryIFR) <br />_ Residential(RS) Recreation(RC) <br />_ Developed Water Resources(WR) <br />_ General Agriculture(GA) <br />Wildlife llabitat(WL) <br />_ Industrial/Commercial(IC) <br />_ Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truckishovel): Material will be mined with excavation equipment, <br />placed in haul trucks or on conveyors, transported to processing equipment on site. <br />15. On Site Processing: X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck(shovel): Crushing, screening, washing of stockpiled sand and gravel, <br />production of concrete and asphalt, milling to recycle concrete and asphalt. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: None anticipated <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The purpose of this amendment is to add a slurry wall to the HIBE property (Phase 4), to change the reclamation of the plan for <br />this phase to developed water resources, and to account for processing the materials from the adjacent Parker - Dersham <br />operation. <br />