Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />- Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />Cessation <br />CV- 2014 -004 <br />Order No. <br />Date NOV or <br />June 26, 2014 <br />CO Issued: <br />Mine: <br />New Horizon North Mine <br />Operator (If <br />Western Fuels- Colorado, LLC <br />Other than <br />Permittee): <br />Mail Address: <br />12050 N. Pecos St., Suite 100 <br />Westminster, CO 80234 <br />Notice of <br />Violation No. <br />Permit No.: <br />County: <br />Type of Mine <br />CV- 2014 -004 <br />C- 2010 -089 <br />Montrose <br />Surface <br />Permittee: Western Fuels- Colorado, <br />LLC <br />Mail Address: 12050 N. Pecos St., Suite 100 <br />Westminster, CO 80234 <br />In Violation CV- 2014 -004, the deadline for abatement of the practice, condition or violation described <br />was fixed as described below. It is hereby found that the operator has failed to abate such practice, <br />condition or violation, or cannot complete abatement within the time allowed, but that such failure is <br />not due to lack of diligence on the part of the operator. The time for abatement is therefore extended <br />as follows: <br />Abatement Description <br />Step <br />1 Reconstruct the sections of NHN -001 East and West <br />Ditches that are currently not in compliance with their <br />original approved designs; or obtain approval of <br />aTechnical Revision revising the original approved <br />designs, in compliance with the requirements of Rule <br />2.05.3(4)(d), so as to conform to the on- the - ground <br />construction. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Is�ssue: January 20, 2015 <br />By: <br />(Signature of Authorized Representative) <br />Brock Bowles <br />Environmental Protection Specialist <br />Original Date <br />Due <br />September 15, <br />2014 <br />Extended <br />Due Date <br />February 27, <br />2015 <br />[Signature of Division Director, if extension is beyond 90 days, <br />pursuant to Rule 5.03.2(2)(e)]. The Division's justification for <br />approving the extension beyond 90 days is attached. <br />