Laserfiche WebLink
Blasting took place at the time of this inspection, but, no blasting occurred on the reclaimed <br />parcels. <br />All haulroads for this permit were constructed and certified according to the permit <br />specifications. <br />All signs and markers were present. <br />The post mining land use for this permit is rangeland. <br />There were no violations noted at the time of this inspection. <br />Overall, the majority of the 277.8 acres within this bond release application appeared to conform <br />to 30 CFR, Part 800.40 and 906.30, and SMCRA 30 U.S.C. 1269 for Phase II bond release. I <br />recommend this site be given a Phase II bond release. <br />