My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-22_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2015-01-22_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:48 PM
Creation date
1/22/2015 1:29:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
1/22/2015
Doc Name
OSM Review Letter
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
SL16
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />Western Region Office <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202 -3050 <br />1/9/2015 <br />Virginia Brannon, Director <br />Office of Mined Land Reclamation <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 -2273 <br />P V ,DE�ED <br />OAS W iifo <br />t <br />RE: Approval of SL -16 Phase II Bond Release, Trapper Mine, Permit No. C -1981- <br />010. <br />Dear Mrs. Brannon, <br />This letter acknowledges the Office of Surface Mining Reclamation and Enforcement ( OSMRE), <br />Denver Field Division (DFD) receipt and review of the above Phase II Bond Release Proposed <br />Decision document prepared by the Division of Reclamation Mining and Safety (DRMS) dated <br />December 12`", 2014. The Proposed Decision documents the applicant's compliance with the <br />approved Colorado regulatory program at Rule 3.03.2. <br />This 277.8 acre Phase II bond release applies to the Ashford/Flintock/East Flintock (Z) and <br />Kimber sections (1, 6, 26, 28, 31, 35 and 36.) of the Trapper Mine, Craig, CO. These sections <br />have been retopsoiled, reseeded, and hydrologically balanced. <br />OSMRE participated in the bond release inspection held on October 15, 2014. The Bureau of <br />Land Management (BLM) did not participate in the inspection. By letter, dated December 30th, <br />2014, the BLM provided its concurrence with the SL -16 bond release (attached). OSMRE <br />interprets the BLM's concurrence to mean that Trapper is in compliance with all BLM coal lease <br />stipulations. <br />OSMRE agrees with DRMS that Trapper has met or exceeded the requirements for Phase II <br />bond release on the 277.8 acres of land as described above. The Division currently holds a <br />performance bond in the amount of $30,173,724.00 for the Trapper Mine. No reduction in the <br />amount of the bond is sought with this bond release. OSMRE agrees with the findings and <br />decision document and hereby provides OSMRE concurrence for the above bond release action <br />in accordance with 30 CFR 740.15 (d) (3), and 30 CFR 906.30, Article IX, Section 24, of the <br />State - Federal Cooperative Agreement. <br />Thank you and your staff for coordinating this Federal mine bond release action through the <br />DFD. Please direct any questions concerning this action to Duane Matt, Physical Scientist at <br />dmatt @OSMRE.gov or (303) 293 -5072. <br />
The URL can be used to link to this page
Your browser does not support the video tag.