Laserfiche WebLink
NT pr DEPT. OF THE INTERIOR <br />Z� <br />p OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />q State Program <br />1. Permittee /Person <br />BOWIE RESOURCES LLC <br />2. Address <br />r1500 -N BIG RUN RD <br />3. City 4. State <br />ASHLAND KY <br />5. Zi Code <br />41102 <br />6. Phone Number <br />(606)928 -0462 <br />7. Operator Name, if Different than Permittee <br />BOWIE RESOURCES LLC <br />8. Mine Name <br />BOWIE NO. 2 <br />al <br />9. Permit Number 10. Permit Type <br />C -96 -083 PP <br />11. Field Visit Date 12. Purpose 13. SRA Present <br />11/7/2015 [OPI <br />nun - dd - <br />14. Permit Status 15. Site Status 16. Facility Type <br />0 AP BCEF <br />17. OSM Office # 18. CCID # 19. Land Code <br />140 1 1 SF <br />20. M.S.H.A. ID # 21. State Abbrev. 22. Coun /Burrough <br />05 -04591 1 GUNNISON <br />23. AVS Permittee Entity ID Number 24. State Office <br />154464 0 <br />25. Hours 26. Si nat a Block 27. Reviewin Offs ial: <br />4.0 a. Permit Review ��`- "' r �,�/ ,_ <br />4.0 b. Site Visit Time <br />Signature: Signature: <br />8.0 c. Travel Time John Shumate, ID #545 Review Date: a -Zc <br />3.0 d. Report Writing Printed Name: mm - dd - yyyy <br />Date: 1/14/2015 Is Supplemental MSE Page Used YIN ET <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 CCR..Citizen Complaint Referral (non -site visit <br />Oxx ... Oversight RFx..Reclamation Fees CC ..... Citizen Complaint (initial site visit) <br />Axx ... Assistance Fxx ... Federal Actions CCF ... Assistance <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector at any time during the review of the mine site <br />Permit Status - Item 14 AB Abandoned: All surface and underground coal mining activities have ceased and operator <br />A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />disturbed. AB1 Bond Forfeiture: Bond forfeiture officially in process or completed and reclamation in <br />IN Inactive (Permanent Program Permit): Phase II completed or progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit): A132 Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site, <br />Coal mining completed and reclamation activities initiated. but site not reclaimed to Program standards. <br />BR Bond Release: Reclamation completed and State Regulatory AB3 Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority(RA) has released all of the bond (Phase III Release). NA Not Applicable: When site is unpermitted. <br />Site Status - Item 15 MC Mining Complete: No mining activity on site, site NS Non -Site Visit: Status of site not determined. <br />ND No Disturbance: No coal mining and reclamation regraded and awaiting bond release. Forfeiture Pending: The RA is pursuing actions to <br />operations have been started. TC Temporary Cessation: The RA has granted FP revoke the permit, collect the performance bond(s), <br />EX Coal Exploration: Coal exploration operations have cessation of mining pursuant to 30 CFR and /or reclamation of forfeited site is in progress. <br />started and where coal mining operations have not 816/817:13(b). FR Forfeited and Reclaimed: Forfeiture reclamation <br />begun. P1 Phase I Release: At least Phase I bond release completed. <br />AP Active Coal Producing: Coal surface mining granted for entire permitted area. For interim FO Abandoned Site: Abandoned site that is permitted but <br />activities are occurring. permits, partial bond release. there is no bond. <br />AN Active Non - Producing: Active non - producing facility P2 Phase II Release: At least Phase II bond release WC Wildcat: Coal mining and reclamation operations have <br />such as tipple or preparation plant. for the entire permitted area. or are taking place and the activity is not covered by <br />NM No Mining: The Permit Status is active, site is not in P3 Phase III Release: Reclamation completed and the required permits from the RA. <br />Temporary Cessation, no surface coal mining the RA has released all bond. <br />activity, and site not regraded. <br />Facility Type Codes - Item 16 D....Ancillary (Haulroad, Conveyor, and /or Rails H ... Exploration Permits K .... Government Financed Construction Exemption <br />A....Surface E .... Refuse and /or Impoundment I .... Notice of Intent to Explore L .... Remining site permitted under 30 CFR 785.25 <br />B. ... Underground F .... Loading Facility and /or Tipple J .... Exempt 16 and 2/3 <br />C .... Preparation Plant G .... Stockpiles <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions. The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business. If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1 -888 -REG -FAIR (1$88 -734- 3247). <br />Page 1 <br />