Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />January 16, 2015 <br />Zach Trujillo <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: CAM Colorado, LLC, Fruita Loadout <br />2014 Annual Reclamation Report <br />Permit No. C- 2010 -088 <br />Dear Mr. Trujillo: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />JAN 21 2015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />On behalf of CAM Colorado, LLC, enclosed is its 2014 Annual Reclamation Report. <br />No surface disturbance occurred at the Fruita Loadout during calendar year 2014. The <br />permit for the Fruita Loadout was approved during the first quarter of 2012, however <br />construction of the loadout has been delayed. The loadout will be constructed after the <br />McClane Canyon Mine obtains a coal sales contract or after another mine expresses an <br />interest is using the loadout. Neither event is expected to occur in the foreseeable <br />future. <br />Since there has been no surface disturbance at the Fruita Loadout, a map is not <br />deemed necessary and therefore not attached. <br />Please call with any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />