My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-21_REPORT - C2010088 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C2010088
>
2015-01-21_REPORT - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:16:09 AM
Creation date
1/22/2015 8:38:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Report
Doc Date
1/21/2015
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Hydrology Report
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7th STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />January 16, 2015 <br />Zach Trujillo <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: CAM Colorado, LLC, Fruita Loadout <br />2014 Annual Hydrology Report <br />Permit No. C- 2010 -088 <br />Dear Mr. Trujillo: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />JAN 21 2015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Please accept this letter as the 2014 Annual Hydrologic Report for the Fruita Loadout. This report <br />is for the 2014 calendar year. <br />No surface disturbance occurred at the Fruita Loadout during calendar year 2014. The permit <br />for the Fruita Loadout was approved during the first quarter of 2012, however construction of <br />the loadout has been delayed. The loadout will be constructed after the McClane Canyon Mine <br />obtains a coal sales contract or after another mine expresses an interest is using the loadout. <br />Neither event is expected to occur in the foreseeable future. <br />Water monitoring was suspended with approval of Technical Revision No. 1, which was approved <br />on October 10, 2012. There was no discharge from the sediment pond or consumptive use during <br />the year. <br />Please call with any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.