Laserfiche WebLink
EMERGENCY SPILLWAY <br />1. Does it appear that the emergency spillway has discharged water since the last inspection? <br />YES NO x <br />2. Is erosion occurring at any section of the emergency spillway? <br />YES NO x <br />SEDMIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />YES NO x <br />Explain: All of the sediment has recently been cleaned out of this pond. <br />OTHER OBSERVATIONS <br />Pond 9a had very little water in it at the time of the inspection. The top 4 inches was <br />ice. All other areas observed at the pond were functional at the time of the inspection. <br />Vince Massarotti ' / � / /J,, /3 5 <br />MSHA CERTIFIED IMPOUNDMENT INSPECTOR <br />12 -5 -2014 <br />DATE <br />Page 2 of 2 <br />