My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-21_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-01-21_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:46 PM
Creation date
1/21/2015 10:13:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
1/21/2015
Doc Name
Letter and Application
From
Blue Mountain Energy, Inc
To
DRMS
Type & Sequence
MR163
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
two �a <br />"tg COLORADO DIVISION OF MINERALS AND GEOLOGJRECEIVED <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />IAN 1 12015 <br />DIVISION OF RECLAMATION <br />APPLICATION FORM FOR A REVISION MININGAND SAFETY <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 018 Date: 01 / 15 / 2015 <br />Permittee: Blue Mountain Energy, Inc. <br />Street: <br />3607 CR 65 <br />City: Rangely <br />State: CO I Zip Code: 81648 _ <br />Brief Description of Revision: Construction of nine exploration, five degas, <br />and N2 lines. <br />Public Notice Attached: Yes No V. (Required for PRs and TRs) <br />Bond Increase: <br />Yes ✓ <br />No Federal <br />✓ Non - Federal <br />Mine <br />Proposed Change in: <br />Permit Area - <br />(Reduction) <br />Surface Ownership - <br />Disturbed <br />( +/ -) _ <br />_ 11 23 Acres <br />Private Land <br />( + / -) _ _ _ —Acres <br />Permit <br />( +/ -) _ <br />_ 0. I Acres <br />Federal Land <br />( + / -) _ _ _ . —Acres <br />Affected <br />( +/ -) _ <br />_ 2. 61 Acres <br />State Land <br />( + / -) _ _ _ —Acres <br />Mineral Ownership - <br />Mineral Private ( + / -) _ _ _ Acres <br />Mineral Federal ( + / -) _ _ — —Acres, <br />Mineral State ( + / -) _ _ _ —Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.