Laserfiche WebLink
amec <br /> CQA ACTIVITIES: <br /> I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; SF, SSF, UD, and SLF sampling; clearing and grubbing; underground working <br /> remediation and confirmatory drilling; topsoil removal; and <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory tes'ing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> ✓ Soil Liner Fill Sample SLF169-C (Control sample) <br /> ➢ Structural Fill Sample SF113-R (Record sample) <br /> • Underdrain Fill Sample 2UF2-R (Record sample) <br /> > Select Structural Fill Sample 2SSF1-R (Record sample) <br /> General Project Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held January 7, 2014 (AMEC, CC&V, Ames) <br /> Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects,AMEC, and Ames. <br /> Miscellaneous: None. <br /> Deliveries: None. <br /> Submitted Erictorenson--`r,, Date: January 13, 2015 <br /> Reviewed by: Date: January 13, 2015 <br /> Tim Byrkhard <br /> Project\Resident <br /> Phone: 71.9-689-2986 <br /> CC&V Projects <br /> Reviewed By: � (� � � Date: ///-5 <br /> Reviewed By: j, a Date: I j.,5" <br /> 2015-01-10-mle2 meekly final Page 3 c`6 <br />