Laserfiche WebLink
cRECFIVED <br /> rp. JAN 2 0 2015 <br /> Page 2 of 3 <br /> DIVISION C" rii;.. ..AMATION, <br /> MINING �TE 112d-1 Annual Report <br /> Permittee Name: Fortune Revenue Silver Mines,Inc Permit Number. ____ M-2012-032 <br /> Operation Name: Revenue Mine County: , Ouray <br /> Annual Fee Due: $1,150.00 Anniversary Date: February 5,2015 J <br /> Permit Acreage: 34.19 Current Bond Amt: _ $340,570.00 <br /> According to C.R.S.34-32.5-116 or 34-32-116,each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). 410 NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). (146- C)NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3,1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? 40 t:xkaf -fir, or Th <br /> 5. Does the mine operate more than 180 days per year YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES <br /> b)approval for INTERMTI-rENT OPERATION? YES Q <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). 11,1 <br /> 8. Number of acres that were newly affected during the current report year. d.r7 <br /> 9. Number of acres that were reclaimed during the current report year. 0.1 <br /> 10. Estimated new acreage to be affected in the next report year. 3 .2_ <br /> 11. Estimated acres to be reclaimed in the next report year. 2. .0 <br /> 12. Total acres in various stages of reclamation,sincepermitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: ( � seeded w/ -1 w/topsoil .7 mulched w/ <br /> approved mix: replaced: — approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: t fertilized w/ replacement b.0 rate(tons): 3•1(A <br /> 2' apvd fertilizer: depth(in.): <br /> -Seed Fertilizer Mulch <br /> application ,rcac435-t application R-,(/A application N 1(A <br /> method: I method: _ _ method: _ I <br />