Laserfiche WebLink
NOTE Additional Information regarding Hole HW-8104 <br /> An 18" conductor hole was drilled from Surface to 80'. 10-3/4" conductor pipe installed from 0-80'. <br /> Monitor hole was drilled to a 9-7/8" diameter from 80'-2285' TD. <br /> Ream & Under ream hole with 12-1/4" bit 2138'-2285' TD <br /> Run 7.625" Casing from 0' —2127' <br /> Pump Spacer(40 bbls, Mud Push II, 9.0 ppg, 3.9 BPM) <br /> Cement Casing with: <br /> LEAD: pumped 131 bbls (307 sx Litecrete cement, w/ D124 extender 47.01 lb/sk BWOB <br /> + D065 Dispersant+ 0.50% BWOB, D046 Antifoam + 0.2% BWOB, D167 Fluid loss <br /> + 0.20, pumped at 3.9 BPM, 9.74 ppg) <br /> TAIL: Pumped 22 bbls (81 sx, Class G design cement 94.02 lb/sx BWOC +D400 gas control agent, 0.65% BWOB + <br /> + D046 antifoam +0.20% BWOB + D154 extender 6.5% BWOB + D066 Silica 30.0% BWOB + D202 Dispersant <br /> 0.60% BWOB, 2.5 BPM 15.8 ppg) <br /> Good Returns throughout job <br /> Drill out w/6-1/2" bit 2079' to 2132' <br /> Wash out mud 2132'-2285' TD (12-1/4" hole) <br /> Run 4.5"-27.96#/ft. Stainless Steel (SS) canister from 2129'-2264' <br /> Run 4.5"-11.6#/ft J-55 casing from 0'-2129' <br /> Placed swellable packer 2059'-2074' <br />