Laserfiche WebLink
NOTE Additional Information regarding Hole HW-8103 <br /> An 18" conductor hole was drilled from Surface to 81'. 10-3/4" conductor pipe installed from 0-81'. <br /> Monitor hole was drilled to a 9-7/8" diameter from 81'-2285' TD. <br /> Ream & Under ream hole with 12-1/4" bit 2138'-2285' TD <br /> Run 7.625" Casing from 0' —2127' <br /> Pump Spacer(40 bbls, Mud Push II, 9.0 ppg) <br /> Cement Casing with: <br /> LEAD: pumped 124 bbls (305 sx 2.41 cu ft/sx) Litecrete cement at 9.5 ppg w/44.6 lb/sx D907 + 8.9 lb/sx D154 <br /> + 46.5 lbs/sx D124 + 0.5% BWOB D065 Dispersant+ 0.2% BWOB, D046 Antifoam + 0.2% BWOB, <br /> D167 Fluid loss pumped at 4.5 BPM <br /> TAIL: Pumped 22 bbls (81 sx, 1.54 cu ft/sx) Class G design cement at 15.8 ppg w/94 lb/sx D907 +0.2% D046 <br /> BWOB antifoam + 0.65% BWOB + D400 + 6.5% BWOB, D154 + 30.0% BWOB, D066 Silica 0.6% D202 BWOB <br /> Pumped at 4.5 BPM <br /> Good Returns throughout job <br /> Drill out w/6-1/2"" bit 2075' to 2130' <br /> Wash out mud 2130'-2285' TD (12-1/4" hole) <br /> Run 4.5"-27.96#/ft. Stainless Steel (SS) canister from 2130'-2265' <br /> Run 4.5"-11.6#/ft J-55 casing from 0'-2130' <br /> Placed swellable packer 2061'-2076' <br />