Laserfiche WebLink
NOTE Additional Information regarding Hole HW-8105 <br /> An 18" conductor hole was drilled from Surface to 80'. 10-3/4" conductor pipe installed from 0-80'. <br /> Monitor hole was drilled to a 9-7/8" diameter from 80'-2286' TD. <br /> Ream & Under ream hole 12-1/4" bit 2138'-2286' TD <br /> Run 7.625" Casing from 0' —2127' <br /> Mix and pump 40 bbls Mudpush II @ 9.0 ppg <br /> Cement Casing with: <br /> LEAD: Litecrete Cement: pumped 120 bbls (284 sx, 2.38 cu ft/sx) with <br /> + 0.5% BWOB D065 Dispersant+ 0.2% BWOB, D046 Antifoam + 0.2% BWOB, D167 Fluid loss <br /> + 0.25 lb/sx pumped at 3 BPM, 9.5 ppg followed by: <br /> TAIL: Class G Design cement: pumped 24 bbls (91 sx, 1.47 cu ft/sx), 2% D046, BWOC Antifoam <br /> + 0.15% BSOB, D013 Retarder+ 0.3% BSOB, D065 dispersant+ 30.0% BWOB, D066 Silica pumped @ 3 BPM <br /> Good Returns throughout job <br /> Drill out w/6-1/2" bit 2079' to 2130' <br /> Circulate out 12-1/4" hole with clean water 2130'-2286' TD <br /> Run 4.5"-27.96#/ft. Stainless Steel (SS) canister from 2130'-2265' <br /> Run 4.5"-11.6#/ft J-55 casing from 0'-2129' <br /> Placed swellable packer 2056'-2071' <br />