Laserfiche WebLink
Table 1 <br /> Martin Marietta <br /> 2014-2015 South Platte Combined Sites SWSP <br /> Howe Pit Demands Table <br /> On-site Water Water Used Operational Evaporative Total <br /> Aggregate Retained for Dust Concrete Consumptive Consumptive Consumptive Lagged <br /> Month Production in Product Control Batching Use Use Use Depletion <br /> (tons) (acre-feet) (acre-feet) (acre-feet) (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br /> (1) (2) (3) (4) (5) (6) (7) (8) <br /> Nov 0 0 0 0 0 n/a 0 0.04 <br /> Dec 0 0 0 0 0 n/a 0 0.03 <br /> Jan 0 0 0 0 0 n/a 0 0.03 <br /> Feb 0 0 0 0 0 n/a 0 0.03 <br /> Mar 0 0 0 0 0 n/a 0 0.03 <br /> Apr 0 0 0 0 0 n/a 0 0.03 <br /> May 0 0 0 0 0 n/a 0 0.02 <br /> Jun 0 0 0 0 0 n/a 0 0.02 <br /> Jul 0 0 0 0 0 n/a 0 0.02 <br /> Aug 0 0 0 0 0 n/a 0 0.02 <br /> Sep 0 0 0 0 0 n/a 0 0.02 <br /> Oct 0 0 0 0 0 n/a 0 0.21 <br /> Total 0 0 0 0 0 n/a 0 0.50 <br /> Notes: <br /> (1)Total material mined(no mining will occur during 2014-2015 SWSP) <br /> (2)Water retained in product calculated as 4%of aggregate production per SB 89-120 <br /> (3)Water used for dust control(no dust control is planned for the Howe Pit Site during the SWSP renewal period) <br /> (4)Water used for concrete batching(no concrete batching will occur during 2014-2015 SWSP term) <br /> (5)Operational consumptive use=(2)+(3)+(4) <br /> (6)Evaporative losses replaced by Denver Water <br /> (7)Total consumptive use=(5)+(6) <br /> (8)Reflects lagged depletions due to evaporation,operational uses and past mining activities at the site based on Glover analysis <br /> using following parameters: <br /> X= 2,400 ft <br /> T= 45,000 gpd/ft <br /> S= 0.2 <br /> W= 5,900 ft <br /> (9)Reflects lagged depletions due to evaporation,operational uses and past mining activities at the site based on same parameters <br /> as(8) <br /> BBA <br /> s%i.,r a ol.tiil l,r> 81!NOP fro' i?£N 10,80C 14111 INC <br />