Laserfiche WebLink
Mr. David M. Heintz Page 8 of 8 <br /> MMM South Platte Combined Replacement Plan <br /> January 8, 2015 <br /> substitute supply is of a quality to meet requirements of use to senior appropriators. As such, <br /> water quality data or analysis may be requested at any time to determine if the water quality <br /> is appropriate for downstream water users. <br /> 19. The decision of the State Engineer shall have no precedential or evidentiary force, shall not <br /> create any presumptions, shift the burden of proof, or serve as a defense in any water court <br /> case or any other legal action that may be initiated concerning the substitute water supply <br /> plan. This decision shall not bind the State Engineer to act in a similar manner in any other <br /> applications involving other plans or in any proposed renewal of this plan, and shall not imply <br /> concurrence with any findings of fact or conclusions of law contained herein, or with the <br /> engineering methodologies used by the Applicant. <br /> If you have any questions concerning this approval, please contact loana Comaniciu in Denver <br /> at (303) 866-3581 or Dean Santistevan in Greeley at (970) 352-8712. <br /> Sincerely, <br /> v✓ <br /> Jeff De..therage, P.E. <br /> •- of Water Supply <br /> Attachments: Figures 1, 2 <br /> Tables 1 - 5 <br /> City of Aurora Lease <br /> cc: Dean Santistevan, Water Resource Engineer; Dean.Santistevan@state.co.us <br /> 810 9th Street, 2"d Floor, Greeley, Colorado 80631, 970-352-8712 <br /> Bill Schneider, Water Commissioner District 2; William.Schneider @state.co.us <br /> 810 9th Street, 2nd Floor, Greeley, Colorado 80631, 970-686-0628 <br /> Division of Reclamation Mining and Safety <br /> JD/JMW/idc <br />