Laserfiche WebLink
XIX. Mountaintop Removal <br />A. This section does not apply to the Terror Creek Loadout. <br />XX. Operations on Steep Slopes <br />A. This section does not apply to the Terror Creek Loadout. <br />XXL In Situ Processing <br />A. This section does not apply to the Terror Creek Loadout. <br />This concludes the January 16, 2015 Proposed Decision and Findings of Compliance for the <br />Terror Creek Loadout's Permit Renewal 06. <br />23 <br />